How to build a double fire wall between Rand and Milstein Halls

Some (but not all) of the Code-compliance problems Cornell is experiencing with their Rand Hall Fine Arts Library proposal result from the large floor area of the combined Rand-Milstein-Sibley Hall building. This combined area far exceeds the allowable area, even if all the buildings were of Type IIB (non-fireproofed steel) construction, like Rand Hall and Milstein Hall. I’ve outlined some of the false statements made by Cornell and its Code consultant in order to get Code variances for this project. But it turns out to be relatively easy to build a 3-hr fire wall between Rand and Milstein Hall, which would allow Rand Hall to be considered as a separate building with its own construction type (IIB) and a compliant floor area. Cornell considered a bizarre and difficult-to-build 2-hr fire wall in its schematic design proposal, which would have been noncompliant in any case since a 3-hr fire wall is needed, but this fire wall disappeared in the design development phase, replaced by a noncompliant 2-hr fire barrier. In order to use this noncompliant fire barrier, a Code variance was needed. It’s actually much easier to build a 3-hr double fire wall, as shown schematically below, since Rand and Milstein Halls are already structurally independent, and each half of the double fire wall only needs to have a 2-hr fire rating. Links to all my blog posts and articles on the Fine Arts Library proposal can be found here.

Schematic section showing a 3-hr double fire wall, based on Section 1, Sheet A5-12, Milstein Hall working drawings. No structural modifications to either building are needed.

Leave a Reply

Your email address will not be published. Required fields are marked *

I accept that my given data and my IP address is sent to a server in the USA only for the purpose of spam prevention through the Akismet program.More information on Akismet and GDPR.